Infra-Source installed a new gas line and upgraded the gas meter.
The new 425 meter installed. Also notice the DLM modules by the meter.
Close up of the new meter. This size meter is commonly needed when installing 14kw and larger generators.
This generator is ready for the next outage! There is also a 15amp gfci receptacle underneath the lockable gray cover on the end. It would be easy to run an extension cord directly from the generator to a nice neighbors house.
200 amp se rated ATS installed part way installed. This is the intelligent transfer switch that can sense the electrical load and manage it.
Complete! Passed electrical inspection same day.