This generator installation was in Mercer Island, WA and needed PSE to upgrade the gas meter.
The PSE technician is hard at work here connecting a new 425 gas meter to the existing natural gas piping.
Due to space limitations the generator was installed on the back patio. This was within the setback guidelines of Mercer Island.
The transfer switch will transfer power in only a matter of seconds during an outage.