Archive for December 2012
10kw Generac in maple valley, new construction
We connected this generator to the propane tank. This home has a remote pedastal PSE meter base, two electrical panels, a well, and septic system. By working with the homeowner from the beginning we were able to affordably instal backup power. We brought in the propane company we have partnered with, and had the proper…
Read More10 kw Generac installation kent, WA
This customer had PSE upgrade their gas meter before we even arrived with the generator because they also installed a high BTU tankless H20 tank. It made our work of installing the generator gas line very clean and neat. The transfer switch has been connected to a 320 amp residential service. We were able to…
Read More8kw Generac, Natural gas with prepack load center
We buried the gas and electrical lines up to the generator. The electrical inspector gave us approval before we covered the electrical lines. The city of Auburn approved our gas line work that was neatly routed inside the garage. A gas line pressure test showed that there were no leaks. This gas line is dedicated…
Read MoreAuburn 12kw Honeywell installation
We reconfigured the main feed into the house and used the 100 amp transfer switch that came with the generator. The electrical inspector approved the installation. Frequently we receive calls from individuals or contractors that feel these 100 amp ATS’s aren’t useful. The good news is that in some cases these ATS’s can work wonderfully…